Community Asset Process
As part of the ongoing improvement works to Hesketh Park, Sefton Council is seeking to appoint a partner to take on a lease of the Conservatory building through the Community Asset Process. The Council believes a community-led approach could help unlock new opportunities for the conservatory while preserving its important place at the heart of the park.
You can use this link to find out more about the Community Asset Process and opportunities available.
What work is taking place on the Conservatory?
The Council is working closely with the Marks Family Trustees and The Hesketh Park Heritage Group to plan and manage the restoration, and improvement works to the park to ensure the donation is appropriately allocated. This reflects a comprehensive restoration-led approach, aimed at bringing the listed structure back into safe, functional public use while conserving its historic fabric.
Summary of Proposed Works – Hesketh Park Conservatory
Drainage
Full replacement and upgrade of the existing drainage system (above and below ground), including restoration of gutters and integration with the existing lake outfall.
Internal Floor
Careful lifting, cleaning, and reinstatement of the existing York stone floor and planting bed edgings, alongside new sub-base and drainage improvements.
Significant repair and strengthening of the metal frame, including addressing corrosion, replacing/augmenting structural elements, and full removal of defective coatings and repainting.
Cast Iron Columns
Cleaning, repair and conservation of existing columns as part of the overall metalwork restoration.
Glazing (Vertical & Roof)
Removal, repair and reinstatement of glazing systems, including overhaul of glazing bars, replacement of defective components, and full cleaning.
Clerestory Windows
Removal and off-site restoration of high-level windows, returning them to operational condition, with introduction of new opening lights where required.
Canopy
Full dismantling, off-site restoration, and reinstatement of the external glazed canopy structure.
Masonry
Cleaning, repointing, and localised repairs to the brick plinth and stone copings.
Doors
Replacement of principal timber doors and refurbishment of the boiler house door.
Boiler House
Repairs to roof structure, rainwater goods, masonry, and internal elements.
Mechanical & Electrical
Full replacement of services systems from the boiler house distribution point.
Please note that this summary is provided for Expression of Interest purposes and outlines the anticipated scope of works at this stage. The final scope will be confirmed following tender returns and may be refined through ongoing design development and contractor engagement.
Restrictions on use
Due to the Hesketh Park Café having exclusive catering rights to the park, the sale of food and drink to the general public cannot be permitted from the Conservatory.
However, for uses of the Conservatory as an events venue, the sale of food and drink would be permitted to event attendees, for consumption within the area detailed in the attached plan.
What happens next?
Expressions of Interest will be assessed for eligibility, asset suitability, and alignment with Council priorities.
Costs
Applicants are responsible for assessing repair liabilities, utility upgrades, and ongoing operational costs.
In Summary
If you wish to express interest in the Hesketh Park Conservatory, please visit the Community Asset process webpage for more information including the Policy, guidance documents, information packs and support available.